Case Study
Monnoir Wind Project
PEG identified the area for the development of a wind power project and completed a pre-feasibility analysis for the Coopérative d’électricité de Saint-Jean-Baptiste in 2021. Several mandates were subsequently carried out, including environmental surveys and authorization requests for meteorological masts installation. The project was selected in Hydro-Québec’s 2023 call for tenders.